Concrete & Foundation Requirements For Steel Building Kits
1. For ground mounting your steel building you will need to dig a post
hole that is approximately ten inches in diameter and at least thirty
inches deep around the area you want to construct your steel building
kit. Depending on whether you purchase a four foot or five foot on
center system will determine if these post holes should be four or five
feet apart.
2. You will need to assemble the base rails for your steel building kit
and lay them in their correct placement around the foundation area where
your steel building will be constructed. You will need to mark where
the http://www.merriam-webster.com/dictionary/epoxy holes should be dug on your base rails. An easy way to do this is to
poke a 16 D nail into the ground surface going through the pre-drilled
hole that is located on your base rails.
3. Using a post hole digger or a hand auger to dig the various holes
needed at a depth of thirty inches. Make sure that you clean out all
excess dirt within the holes.
4. Lay out your steel building kit base rails according to the
manufacturer's instructions included in your kit. These instructions
will vary according to the steel buildings epoxy floors Gold Coast that you have chosen. Place
the ground anchors that are included in your steel building kit through
the pre-drilled holes. You will need to use either a premixed concrete
or you will need to mix your own concrete mixture according to the
directions. It is preferable to use a 2500 psi concrete mixture for the
strength necessary for desired results. Use a shovel to place the
concrete mixture into each of your dug out holes. It is recommended to
wait at least seven days after laying your concrete for it to properly
set up before you should continue the rest of the assembly process for
your steel building.